H.R. 3548 (112th): North American Energy Access Act

Introduced:
Dec 02, 2011 (112th Congress, 2011–2013)
Status:
Died (Reported by Committee)
Sponsor
Lee Terry
Representative for Nebraska's 2nd congressional district
Party
Republican
Text
Read Text »
Last Updated
Dec 02, 2011
Length
8 pages
 
Status

This bill was introduced on February 7, 2012, in a previous session of Congress, but was not enacted.

Progress
Introduced Dec 02, 2011
Referred to Committee Dec 02, 2011
Reported by Committee Feb 07, 2012
 
Full Title

To facilitate United States access to North American oil resources, and for other purposes.

Summary

No summaries available.

Cosponsors
103 cosponsors (103R) (show)
Committees

House Energy and Commerce

Energy and Power

House Natural Resources

House Transportation and Infrastructure

Railroads, Pipelines, and Hazardous Materials

The committee chair determines whether a bill will move past the committee stage.

 
Primary Source

THOMAS.gov (The Library of Congress)

GovTrack gets most information from THOMAS, which is updated generally one day after events occur. Activity since the last update may not be reflected here. Data comes via the congress project.

Widget

Get a bill status widget for your website »

Citation

Click a format for a citation suggestion:

Notes

H.R. stands for House of Representatives bill.

A bill must be passed by both the House and Senate in identical form and then be signed by the president to become law.

The bill’s title was written by its sponsor.

GovTrack’s Bill Summary

We don’t have a summary available yet.

Library of Congress Summary

The summary below was written by the Congressional Research Service, which is a nonpartisan division of the Library of Congress.


12/17/2012--Reported to House amended, Part I.
North American Energy Access Act -
Section 2 -
Prohibits construction, operation, or maintenance of the oil pipeline and related facilities described in the Final Environmental Impact Statement (EIS) for the Keystone XL Pipeline Project issued by the Department of State on August 26, 2011, unless it is in compliance with the terms of a permit prescribed under this Act (including any modified version of that pipeline and related facilities).
Section 3 -
Instructs the Federal Energy Regulatory Commission (FERC), to issue a permit without additional conditions within 30 days after receipt of an application for the pipeline and related facilities, to be implemented in accordance with such Final EIS.
States that FERC shall not be required to prepare a specified Record of Decision under of the Code of Federal Regulations with respect to issuance of such permit.
Deems a permit to have been issued if FERC has not acted upon a permit application within 30 days after its receipt.
Requires a permit applicant to first obtain FERC approval before making any substantial modifications to either the pipeline route or any other term of the Final EIS.
Directs FERC to expedite consideration of any such proposal to modify.
Directs FERC, within 30 days after enactment of this Act, to: (1) enter into a memorandum of understanding with the state of Nebraska for review under the National Environmental Policy Act of 1969 of any modification to the proposed pipeline route in Nebraska, and (2) complete consideration and to approve such modification within 30 days after receiving the governor's approval.
Deems approval to have been issued if FERC has not acted within 30 days after receiving an application to approve a modification.
Authorizes the permit holder, while modification of the proposed pipeline route in Nebraska is under consideration, to commence or continue construction of any portion of the pipeline and related facilities that are not located within Nebraska.
Section 4 -
Declares that no presidential permit shall be required for the construction, operation, and maintenance of the pipeline and related facilities.
Declares that nothing in this Act shall affect application to the pipeline and related facilities of: (1) federal pipeline safety requirements of the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011; and (2) FERC authority to regulate oil pipeline rates and services.

House Republican Conference Summary

The summary below was written by the House Republican Conference, which is the caucus of Republicans in the House of Representatives.


No summary available.

House Democratic Caucus Summary

The House Democratic Caucus does not provide summaries of bills.

So, yes, we display the House Republican Conference’s summaries when available even if we do not have a Democratic summary available. That’s because we feel it is better to give you as much information as possible, even if we cannot provide every viewpoint.

We’ll be looking for a source of summaries from the other side in the meanwhile.

Use the comment space below for discussion of the merits of H.R. 3548 (112th) with other GovTrack users.
Your comments are not read by Congressional staff.

comments powered by Disqus