Text of To authorize the issuance of right-of-way permits for natural gas pipelines in Glacier National Park, and for other purposes.

...other purposes.

The text of the bill below is as of Apr 24, 2012 (Introduced).

Source: GPO

I

112th CONGRESS

2d Session

H. R. 4606

IN THE HOUSE OF REPRESENTATIVES

April 24, 2012

introduced the following bill; which was referred to the Committee on Natural Resources

A BILL

To authorize the issuance of right-of-way permits for natural gas pipelines in Glacier National Park, and for other purposes.

1.

Permits for existing natural gas pipelines

(a)

In general

The Secretary of the Interior may issue right-of-way permits for each natural gas pipeline (including all appurtenances used in the operation of the natural gas pipeline) that, as of March 1, 2012, is located within the boundary of Glacier National Park.

(b)

Terms and conditions

A permit issued under subsection (a) shall be—

(1)

issued as a right-of-way renewal, consistent with laws (including regulations) generally applicable to utility rights-of-way within units of the National Park System, including the Act of March 4, 1911 (16 U.S.C. 5);

(2)

for a width of not more than 50 feet on either side of the centerline of the natural gas pipeline; and

(3)

subject to any terms and conditions that the Secretary of the Interior determines to be necessary.