II
Calendar No. 82
113th CONGRESS
1st Session
H. R. 271
IN THE SENATE OF THE UNITED STATES
May 23, 2013
Received; read the first time
June 3, 2013
Read the second time and placed on the calendar
AN ACT
To clarify that compliance with an emergency order under section 202(c) of the Federal Power Act may not be considered a violation of any Federal, State, or local environmental law or regulation, and for other purposes.
Short title
This Act may be cited as the
Resolving Environmental and Grid
Reliability Conflicts Act of 2013
.
Amendments to the Federal Power Act
Compliance with or violation of environmental laws while under emergency order
Section 202(c) of the Federal Power Act ( 16 U.S.C. 824a(c) ) is amended—
by inserting
(1)
after (c)
; and
by adding at the end the following:
With respect to an order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation, the Commission shall ensure that such order requires generation, delivery, interchange, or transmission of electric energy only during hours necessary to meet the emergency and serve the public interest, and, to the maximum extent practicable, is consistent with any applicable Federal, State, or local environmental law or regulation and minimizes any adverse environmental impacts.
To the extent any omission or action taken by a party, that is necessary to comply with an order issued under this subsection, including any omission or action taken to voluntarily comply with such order, results in noncompliance with, or causes such party to not comply with, any Federal, State, or local environmental law or regulation, such omission or action shall not be considered a violation of such environmental law or regulation, or subject such party to any requirement, civil or criminal liability, or a citizen suit under such environmental law or regulation.
An order issued under this subsection that may result in a conflict with a requirement of any Federal, State, or local environmental law or regulation shall expire not later than 90 days after it is issued. The Commission may renew or reissue such order pursuant to paragraphs (1) and (2) for subsequent periods, not to exceed 90 days for each period, as the Commission determines necessary to meet the emergency and serve the public interest.
In renewing or reissuing an order under subparagraph (A), the Commission shall consult with the primary Federal agency with expertise in the environmental interest protected by such law or regulation, and shall include in any such renewed or reissued order such conditions as such Federal agency determines necessary to minimize any adverse environmental impacts to the maximum extent practicable. The conditions, if any, submitted by such Federal agency shall be made available to the public. The Commission may exclude such a condition from the renewed or reissued order if it determines that such condition would prevent the order from adequately addressing the emergency necessitating such order and provides in the order, or otherwise makes publicly available, an explanation of such determination.
.
Temporary connection or construction by municipalities
Section 202(d) of
the Federal Power Act (
16 U.S.C. 824a(d)
) is amended by
inserting or municipality
before engaged in the
transmission or sale of electric energy
.
Passed the House of Representatives May 22, 2013.
Karen L. Haas,
Clerk
June 3, 2013
Read the second time and placed on the calendar