skip to main content

H.R. 2216 (115th): To provide that certain project works on the St. Croix River, Maine, are not required to be licensed by the Federal Energy Regulatory Commission.

The text of the bill below is as of Apr 27, 2017 (Introduced).


I

115th CONGRESS

1st Session

H. R. 2216

IN THE HOUSE OF REPRESENTATIVES

April 27, 2017

introduced the following bill; which was referred to the Committee on Energy and Commerce

A BILL

To provide that certain project works on the St. Croix River, Maine, are not required to be licensed by the Federal Energy Regulatory Commission.

1.

Federal Power Act license not required for certain project works on the St. Croix River, Maine

Any project works in existence as of the date of enactment of this Act, or as may later be modified, that are licensed by the Federal Energy Regulatory Commission under Commission Project numbers 2492, 2618, and 2660, as in effect on such date of enactment, shall not be required to be licensed under part I of the Federal Power Act (16 U.S.C. 792 et seq.).