skip to main content

H.R. 2828 (115th): To extend the deadline for commencement of construction of a hydroelectric project.

We don’t have a summary available yet.

The summary below was written by the Congressional Research Service, which is a nonpartisan division of the Library of Congress, and was published on Jul 18, 2017.


(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.)

(Sec.1)This bill requires the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Enloe Hydroelectric Project located on the Similkameen River in Okanogan County, Washington.

Additionally, FERC shall reinstate the construction license if it is expired.