skip to main content
React to this bill with an emoji:
Save your position on this bill bill on a six-point scale from strongly oppose to strongly support:

H.R. 951: To extend the deadline for commencement of construction of a hydroelectric project.

The text of the bill below is as of Jun 12, 2017 (Reported by House Committee).

Source: GPO

IB

Union Calendar No. 116

115th CONGRESS

1st Session

H. R. 951

[Report No. 115–172]

IN THE HOUSE OF REPRESENTATIVES

February 7, 2017

introduced the following bill; which was referred to the Committee on Energy and Commerce

June 12, 2017

Committed to the Committee of the Whole House on the State of the Union and ordered to be printed


A BILL

To extend the deadline for commencement of construction of a hydroelectric project.


1.

Extension

(a)

In general

Notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C. 806) that would otherwise apply to the Federal Energy Regulatory Commission project numbered 12642, the Commission may, at the request of the licensee for the project, and after reasonable notice, in accordance with the good faith, due diligence, and public interest requirements of that section and the Commission’s procedures under that section, extend the time period during which the licensee is required to commence the construction of the project for up to 3 consecutive 2-year periods from the date of the expiration of the extension originally issued by the Commission.

(b)

Reinstatement of expired license

If the period required for commencement of construction of the project described in subsection (a) has expired prior to the date of the enactment of this Act, the Commission may reinstate the license effective as of the date of its expiration and the first extension authorized under subsection (a) shall take effect on the date of such expiration.

June 12, 2017

Committed to the Committee of the Whole House on the State of the Union and ordered to be printed