1.

Short title

This Act may be cited as the Drought Resiliency and Water Supply Infrastructure Act.

2.

Definitions

In this Act:

(1)

Design; study

The terms design and study include any design, permitting, materials engineering or testing, surveying, or preconstruction activity relating to a water storage facility.

(2)

Secretary

The term Secretary means the Secretary of the Interior.

3.

Surface and groundwater storage and supporting projects

(a)

Definitions

In this section:

(1)

Appropriate committees of Congress

The term appropriate committees of Congress means—

(A)

the Committee on Appropriations of the Senate;

(B)

the Committee on Energy and Natural Resources of the Senate;

(C)

the Committee on Appropriations of the House of Representatives; and

(D)

the Committee on Natural Resources of the House of Representatives.

(2)

Eligible entity

The term eligible entity means—

(A)

any State, political subdivision of a State, department of a State, or public agency organized pursuant to State law;

(B)

an Indian tribe (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304)) or an entity controlled by an Indian tribe;

(C)

a water users’ association;

(D)

an agency established by an interstate compact; and

(E)

an agency established under State law for the joint exercise of powers.

(3)

Federally owned storage project

The term federally owned storage project means any project in a Reclamation State—

(A)

that involves the construction, expansion, upgrade, or capital repair of—

(i)

a surface water storage facility; or

(ii)

a facility conveying water to or from a surface or groundwater storage facility;

(B)

to which the United States holds title; and

(C)

that was authorized to be constructed, operated, and maintained pursuant to—

(i)

the reclamation laws; or

(ii)

the Act of August 11, 1939 (commonly known as the Water Conservation and Utilization Act) (16 U.S.C. 590y et seq.).

(4)

Non-Federal storage project

The term non-Federal storage project means any project in a Reclamation State that—

(A)

involves the construction, expansion, upgrade, or capital repair by an eligible entity of—

(i)

a surface or groundwater storage facility that is not federally owned; or

(ii)

a facility that is not federally owned conveying water to or from a surface or groundwater storage facility; and

(B)

provides a benefit in meeting any obligation under applicable Federal law (including regulations).

(5)

Reclamation laws

The term reclamation laws means Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act.

(6)

Reclamation State

The term Reclamation State has the meaning given the term in section 4014 of the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note; Public Law 114–322).

(b)

Grant program

The Secretary may provide a grant under this section to an eligible entity to carry out, within a Reclamation State—

(1)

a federally owned storage project in accordance with subsection (c); or

(2)

a non-Federal storage project in accordance with subsection (d).

(c)

Federally owned storage projects

(1)

Agreements

On request of an eligible entity, the Secretary may negotiate and enter into an agreement on behalf of the United States for the design, study, construction, expansion, upgrade, or capital repair of a federally owned storage project located in a Reclamation State in accordance with this subsection.

(2)

Federal share

Subject to the requirements of this subsection, the Secretary may participate in a federally owned storage project in an amount equal to not more than 50 percent of the total cost of the federally owned storage project.

(3)

Conditions for Federal construction funding

The construction of a federally owned storage project that is the subject of an agreement under this subsection shall not commence until the Secretary—

(A)

determines that the proposed federally owned storage project is feasible in accordance with the reclamation laws;

(B)

determines that—

(i)

the federally owned storage project provides a Federal benefit in accordance with the reclamation laws; and

(ii)

not less than a proportionate share of the benefits of the federally owned storage project are Federal benefits, including water supplies dedicated to specific purposes, such as water quality improvements or fish and wildlife protection and restoration, including a wildlife refuge; and

(C)

secures an agreement providing such upfront funding as is necessary to pay the non-Federal share of the capital costs of the federally owned storage project.

(4)

Notification

The Secretary shall submit to the appropriate committees of Congress a written notification of the determinations under paragraph (3) by not later than 30 days after the date of the determinations.

(5)

Environmental laws

In participating in a federally owned storage project under this subsection, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

(6)

Expansion or upgrade

The Secretary shall require, as a condition for design, study, or any other participation in the expansion or upgrade of a federally owned storage project—

(A)

the agreement of any single entity that has an existing water service contract or repayment contract for more than 60 percent of the capacity or yield of the federally owned storage project that the expansion will not adversely affect any right or interest of the entity under the water service contract or repayment contract, as applicable; and

(B)

the agreement of the non-Federal entity that, pursuant to a formal operations and maintenance transfer contract or other legal agreement with the Secretary, acting through the Commissioner of Reclamation, carries out the operations and maintenance of the federally owned storage project, if applicable.

(d)

Non-Federal storage projects

(1)

In general

Subject to the requirements of this subsection, the Secretary may participate in the design, study, construction, expansion, upgrade, or capital repair of a non-Federal storage project in an amount equal to not more than 25 percent of the total cost of the non-Federal storage project.

(2)

Conditions for Federal design and study funding

The Secretary shall only fund a design or study activity for a non-Federal storage project under this subsection if—

(A)

Federal participation has been requested by the Governor of the State in which the non-Federal storage project is located; and

(B)

the Secretary has identified the potential for Federal benefit sufficient to proceed.

(3)

Conditions for Federal construction funding

Participation by the Secretary in the construction of a non-Federal storage project under this subsection shall not occur unless—

(A)

the Governor of the State in which the non-Federal storage project is located has requested Federal participation at the time construction was initiated; and

(B)

the applicable non-Federal sponsor determines, and the Secretary concurs, that—

(i)

the non-Federal storage project is technically and financially feasible;

(ii)

the non-Federal storage project provides a Federal benefit in accordance with the reclamation laws;

(iii)

not less than a proportionate share of the benefits of the non-Federal storage project are Federal benefits, including water supplies dedicated to specific purposes, such as water quality improvements or fish and wildlife protection and restoration, including a wildlife refuge; and

(iv)

each sponsor of the non-Federal project is financially capable of funding the non-Federal share of the project costs.

(4)

Notification

The Secretary shall submit to the appropriate committees of Congress a written notification of the determinations under paragraphs (2) and (3) by not later than 30 days after the date of the determinations.

(5)

Environmental laws

In participating in a non-Federal storage project under this subsection, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

(6)

Information

(A)

In general

In participating in a non-Federal storage project under this subsection, the Secretary—

(i)

shall—

(I)

generally, rely on reports prepared by the sponsor of the non-Federal storage project, including feasibility or equivalent studies, environmental analyses, and other pertinent reports and analyses; but

(II)

retain responsibility for making the independent determinations described in paragraphs (2) and (3); and

(ii)

may prepare studies supplementary to the studies described in clause (i)(I), on—

(I)

request of the sponsor of the non-Federal storage project; and

(II)

agreement by the Secretary.

(B)

Guidelines

(i)

Draft

Not later than 180 days after the date of enactment of this Act, the Secretary shall issue draft guidelines for feasibility or equivalent studies for non-Federal storage projects prepared by a project sponsor that shall be consistent with requirements for a title XVI Feasibility Study Report, including the economic analysis, contained in the Reclamation Manual Directives and Standards numbered WTR 11–01, subject to—

(I)

any additional requirements necessary to provide sufficient information for making the independent determinations described in paragraphs (2)(B) and (3); and

(II)

the condition that the Bureau of Reclamation shall not bear responsibility for the technical adequacy of any design, cost estimate, or construction relating to a non-Federal storage project.

(ii)

Final

The Secretary shall finalize the guidelines under clause (i) by not later than 1 year after the date of enactment of this Act.

(e)

Rights To use capacity

Subject to compliance with applicable Reclamation State water rights laws, the right to use the capacity of a federally owned storage project or non-Federal storage project with respect to which the Secretary has entered into an agreement under this subsection shall be allocated in such manner as may be mutually agreed to by the Secretary and each other party to the agreement, including any party described in subsection (c)(6)(B).

(f)

Federal benefits

In making a determination relating to a Federal benefit under this section, the Secretary may include any benefit realized from the existence of operational flexibility to optimize the achievement of an authorized project purpose (whether reimbursable or nonreimbursable), taking into consideration the hydrology of a given water year, including through the coordinated management of Federal and non-Federal facilities.

(g)

Funding

(1)

Authorization of appropriations

There is authorized to be appropriated to the Secretary to carry out this section $670,000,000 for the period of fiscal years 2020 through 2024.

(2)

Congressional approval initially required

(A)

Design and study funding

Each initial award under this section for design and study of a federally owned storage project or a non-Federal storage project shall be approved in an appropriations Act.

(B)

Construction funding

Each initial award under this section for construction of a federally owned storage project or a non-Federal storage project shall be approved in an appropriations Act.

(C)

Reclamation recommendations

(i)

In general

Subject to clause (ii), the Commissioner of Reclamation shall submit to the appropriate committees of Congress recommendations regarding the initial award of design and study funding, and of construction funding, for each federally owned storage project and non-Federal storage project subject to consideration under subparagraphs (A) and (B).

(ii)

Requirement

The Commissioner of Reclamation shall confer with the appropriate committees of Congress before submitting the recommendations under clause (i).

(3)

Subsequent funding awards

(A)

Design and study funding

After approval by Congress of an initial award of design and study funding for a federally owned storage project or a non-Federal storage project under paragraph (2), the Secretary may award additional design and study funding for the federally owned storage project or non-Federal storage project without further congressional approval.

(B)

Construction funding

After approval by Congress of an initial award of construction funding for a federally owned storage project or a non-Federal storage project under paragraph (2), the Secretary may award additional construction funding for the federally owned storage project or non-Federal storage project without further congressional approval.

(4)

Preliminary studies

Of the amounts made available under paragraph (1), not more than 25 percent shall be provided for appraisal studies, feasibility studies, or other preliminary studies.

(5)

WIIN Act storage funding

(A)

Appropriations

Each federally owned storage project and non-Federal storage project shall be eligible to receive any amounts made available pursuant to section 4007(h) of the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note; Public Law 114–322) (as in effect on the day before the date of enactment of this Act), in accordance with paragraphs (2) and (3).

(B)

Individual projects

(i)

Federally owned storage projects

If the Secretary determines that a federally owned storage project is eligible for funding under section 4007(b) of the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note; Public Law 114–322), the federally owned storage project shall remain eligible for funding under subsection (c).

(ii)

Non-Federal storage projects

If the Secretary determines that a non-Federal storage project is eligible for funding as a State-led storage project under section 4007(c) the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note; Public Law 114–322), the non-Federal storage project shall remain eligible for funding under subsection (d).

(h)

Consistency with State law

Nothing in this section preempts or modifies any obligation of the United States or an eligible entity to act in accordance with applicable State law.

(i)

Partnership and agreements relating to certain water storage projects

The Secretary, acting through the Commissioner of Reclamation, may enter into a partnership or other agreement relating to a water storage project described in section 103 of the Calfed Bay-Delta Authorization Act (Public Law 108–361; 118 Stat. 1683) with a local joint-powers authority established pursuant to State law by 1 or more irrigation districts or other local water districts or units of local government within the applicable hydrologic region, to advance the project.

(j)

Calfed reauthorization

Title I of Public Law 108–361 (118 Stat. 1681; 123 Stat. 2860; 128 Stat. 164; 128 Stat. 2312; 129 Stat. 2407; 130 Stat. 1866) is amended by striking 2019 each place it appears and inserting 2024.

(k)

Conforming amendment

Section 4007 of the Water Infrastructure Improvements for the Nation Act (43 U.S.C. 390b note; Public Law 114–322) is repealed.

4.

Water recycling and reuse

(a)

Authorization of new water recycling and reuse projects

Section 1602 of the Reclamation Wastewater and Groundwater Study and Facilities Act (43 U.S.C. 390h) is amended by striking paragraph (2) of subsection (f) and all that follows through the end of subsection (g) and inserting the following:

(2)

Priorities and diversity of project types

In providing grants under paragraph (1), the Secretary shall—

(A)

give priority to projects that—

(i)

are likely to provide a more-reliable water supply for a unit of State or local government;

(ii)

are likely to increase the water management flexibility and reduce impacts on environmental resources; or

(iii)

provide multiple benefits, including water supply reliability, ecosystem benefits, groundwater management and enhancements, and water quality improvements; and

(B)

take into consideration selecting a diversity of project types, including projects that serve—

(i)

a region or more than 1 community;

(ii)

a rural or small community; or

(iii)

an urban community or city.

(g)

Funding

(1)

Authorization of appropriations

There is authorized to be appropriated to the Secretary to carry out subsections (e) and (f) $100,000,000 for the period of fiscal years 2020 through 2024.

(2)

Funding opportunity announcement

The Commissioner of Reclamation shall release a funding opportunity announcement for the competitive grant program under subsection (f) by not later than 75 days after the date of enactment of an Act that provides funding for the program.

(3)

Congressional approval initially required

(A)

In general

Each initial award under this section for design and study, or for construction, of a project under subsection (e) or (f) shall be approved in an appropriations Act.

(B)

Reclamation recommendations

The Commissioner of Reclamation shall submit recommendations regarding the initial award of design and study funding and construction funding for consideration under subparagraph (A) to—

(i)

the Committee on Appropriations of the Senate;

(ii)

the Committee on Energy and Natural Resources of the Senate;

(iii)

the Committee on Appropriations of the House of Representatives; and

(iv)

the Committee on Natural Resources of the House of Representatives.

(4)

Subsequent funding awards

After approval by Congress of an initial award of design and study funding or construction funding for a project under paragraph (3), the Commissioner of Reclamation may award additional design and study funding or construction funding, respectively, for the project without further congressional approval.

.

(b)

Limitation on funding

Section 1631(d) of the Reclamation Wastewater and Groundwater Study and Facilities Act (43 U.S.C. 390h–13(d)) is amended—

(1)

in paragraph (1)—

(A)

by striking by paragraph (2) and inserting in paragraphs (2) and (3); and

(B)

striking $20,000,000 (October 1996 prices) and inserting $30,000,000 (in prices as determined for January 2019); and

(2)

in paragraph (2)—

(A)

in subparagraph (B)—

(i)

by striking (B) In the case and inserting the following:

(B)

San Gabriel Basin

In the case

; and

(ii)

by indenting clauses (i) and (ii) appropriately; and

(B)

by striking (2)(A) Subject to and inserting the following:

(2)

Projects funded as of 2020

The Federal share of the cost of any single project authorized under this title shall be $20,000,000 if the project has received that amount as of December 31, 2020.

(3)

Older projects

(A)

In general

Subject to

.

5.

Desalination

Section 4(a) of the Water Desalination Act of 1996 (42 U.S.C. 10301 note; Public Law 104–298) is amended by striking the second paragraph (1) (relating to projects) and inserting the following:

(2)

Projects

(A)

Definition of eligible desalination project

In this paragraph, the term eligible desalination project means any project located in a Reclamation State, or for which the construction, operation, sponsorship, or funding is the responsibility of, and the primary water supply benefit accrues to, 1 or more entities in a Reclamation State, that—

(i)

involves an ocean or brackish water desalination facility—

(I)

constructed, operated, and maintained by a State, Indian Tribe, irrigation district, water district, or other organization with water or power delivery authority; or

(II)

sponsored or funded by any State, department of a State, political subdivision of a State, or public agency organized pursuant to State law, including through—

(aa)

direct sponsorship or funding; or

(bb)

indirect sponsorship or funding, such as by paying for the water provided by the facility; and

(ii)

provides a Federal benefit in accordance with the reclamation laws.

(B)

Federal share

Subject to the requirements of this paragraph, the Secretary may participate in an eligible desalination project in an amount equal to not more than 25 percent of the total cost of the eligible desalination project.

(C)

State role

Participation by the Secretary in an eligible desalination project under this paragraph shall not occur unless—

(i)
(I)

the eligible desalination project is included in a State-approved plan; or

(II)

the participation has been requested by the Governor of the State in which the eligible desalination project is located; and

(ii)

the State or local sponsor of the eligible desalination project determines, and the Secretary concurs, that—

(I)

the eligible desalination project—

(aa)

is technically and financially feasible; and

(bb)

provides a Federal benefit in accordance with the reclamation laws; and

(II)

the non-Federal project sponsor is financially capable of funding the non-Federal share of the project costs; and

(iii)

the Secretary submits to Congress a written notification of the determinations under clause (ii) by not later than 30 days after the date of the determinations.

(D)

Environmental laws

In participating in an eligible desalination project under this paragraph, the Secretary shall comply with all applicable environmental laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

(E)

Information

In participating in an eligible desalination project under this subsection, the Secretary—

(i)

may rely on reports prepared by the sponsor of the eligible desalination project, including feasibility or equivalent studies, environmental analyses, and other pertinent reports and analyses; but

(ii)

shall retain responsibility for making the independent determinations described in subparagraph (C).

(F)

Funding

(i)

Authorization of appropriations

There is authorized to be appropriated to carry out this paragraph $60,000,000 for the period of fiscal years 2020 through 2024.

(ii)

Funding opportunity announcement

The Commissioner of Reclamation shall release a funding opportunity announcement for a grant program under this paragraph by not later than 75 days after the date of enactment of an Act that provides funding for the program.

(iii)

Congressional approval initially required

(I)

In general

Each initial award under this paragraph for design and study, or for construction, of an eligible desalination project shall be approved in an appropriations Act.

(II)

Reclamation recommendations

The Commissioner of Reclamation shall submit recommendations regarding the initial award of design and study funding and construction funding for consideration under subclause (I) to—

(aa)

the Committee on Appropriations of the Senate;

(bb)

the Committee on Energy and Natural Resources of the Senate;

(cc)

the Committee on Appropriations of the House of Representatives; and

(dd)

the Committee on Natural Resources of the House of Representatives.

(iv)

Subsequent funding awards

After approval by Congress of an initial award of design and study funding or construction funding for an eligible desalination project under clause (iii), the Commissioner of Reclamation may award additional design and study funding or construction funding, respectively, for the eligible desalination project without further congressional approval.

.

6.

Reclamation infrastructure finance and innovation pilot program

(a)

Establishment

The Secretary shall establish and carry out a pilot program under which the Secretary shall provide to eligible entities described in subsection (c) financial assistance in accordance with this section to carry out eligible projects described in subsection (b).

(b)

Eligible projects

(1)

In general

A project eligible to receive assistance under the pilot program under this section is a water supply project that, as determined by the Secretary—

(A)

is located in—

(i)

the State of Alaska;

(ii)

the State of Hawaii; or

(iii)

a State or territory described in the first section of the Act of June 17, 1902 (32 Stat. 388, chapter 1093; 43 U.S.C. 391);

(B)

would contribute directly or indirectly (including through groundwater recharge) to a safe, adequate water supply for domestic, agricultural, environmental, or municipal or industrial use; and

(C)

is otherwise eligible for assistance under this section.

(2)

Projects associated with Bureau of Reclamation facilities

A project that supports an improvement to, or is associated with, a Bureau of Reclamation facility shall be eligible to receive assistance under the pilot program under this section if—

(A)

the project meets the criteria described in paragraph (1);

(B)

the eligible entity carrying out the project demonstrates to the satisfaction of the Secretary that the eligible entity is initiating and implementing the project for non-Federal purposes;

(C)

the eligible entity retains or secures, through a long-term Federal property lease, operation and maintenance transfer agreement that provides for self-funding, or easement agreement with the Secretary, substantial control over the assets, operation, management, and maintenance of the project; and

(D)

the project meets such other criteria as the Secretary may establish.

(3)

Small community projects

For projects eligible for assistance under this section and section 5028(a)(2)(B) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3907(a)(2)(B)), the Secretary may assist applicants in combining 1 or more projects into a single application in order to meet the minimum project cost of $5,000,000 required under that section.

(c)

Eligible entities

The following entities are eligible to receive assistance under this section:

(1)

An entity described in section 5025 of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3904).

(2)

A conservancy district, Reclamation district, irrigation district, or water district.

(3)

A canal company or mutual water company.

(4)

A water users’ association.

(5)

An agency established by an interstate compact.

(6)

An agency established under State law for the joint exercise of powers.

(7)

Any other individual or entity that has the capacity to contract with the United States under the reclamation laws.

(d)

Requirements

(1)

Project selection

In selecting eligible projects to receive assistance under the pilot program under this section, the Secretary shall ensure diversity with respect to—

(A)

project type; and

(B)

geographical location within the States referred to in subsection (b)(1)(A).

(2)

Importation of other requirements

The following provisions of law shall apply to the pilot program under this section:

(A)

Sections 5022, 5024, 5027, 5028, 5029, 5030, 5031, 5032, and 5034(a) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3901, 3903, 3906, 3907, 3908, 3909, 3910, 3911, 3913(a)), except that—

(i)

any reference contained in those sections to the Secretary of the Army shall be considered to be a reference to the Secretary;

(ii)

any reference contained in those sections to an eligible project shall be considered to be a reference to an eligible project described in subsection (b);

(iii)

paragraphs (1)(E) and (6)(B) of subsection (a), and subsection (b)(3), of section 5028 of that Act (33 U.S.C. 3907) shall not apply with respect to this section; and

(iv)

subsections (e) and (f) of section 5030 of that Act (33 U.S.C. 3909) shall not apply with respect to this section.

(B)

The agreement between the Administrator of the Environmental Protection Agency and the Commissioner of Reclamation required under section 4301 of the America’s Water Infrastructure Act of 2018 (Public Law 115–270), pursuant to which the Administrator shall retain responsibility for administering any loans under this section.

(C)

Other applicable environmental laws, including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

(e)

Authorization of appropriations

(1)

In general

There is authorized to be appropriated to the Secretary to carry out the pilot program under this section $150,000,000 for the period of fiscal years 2021 through 2025, to remain available until expended.

(2)

Administrative costs

Of the funds made available pursuant to paragraph (1), the Secretary may use for administrative costs of carrying out the pilot program under this section (including for the provision of technical assistance to project sponsors pursuant to paragraph (3), to obtain any necessary approval, and for transfer to the Administrator of the Environmental Protection Agency to provide assistance in administering and servicing Federal credit instruments under the pilot program) not more than $5,000,000 for each applicable fiscal year.

(3)

Small community projects

(A)

In general

Subject to subsection (b), the Commissioner may use the funds made available under paragraph (2) to provide assistance, including assistance to pay the costs of acquiring the rating opinion letters under paragraph (1)(D) of section 5028(a) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 3907(a)), to assist project sponsors in obtaining the necessary approvals for small community projects that are eligible for assistance under paragraph (2)(B) of that section or subsection (b)(3).

(B)

Limitation

Assistance provided to a project sponsor under subparagraph (A) may not exceed an amount equal to 75 percent of the total administrative costs incurred by the project sponsor in securing financial assistance under this section.

7.

Restoration and environmental compliance

(a)

In general

The Secretary may participate in—

(1)

environmental restoration activities benefitting species—

(A)

listed as threatened or endangered under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) that are adversely affected by the operation of water projects of the Bureau of Reclamation; or

(B)

through water delivery from a Reclamation project to a wildlife refuge;

(2)

environmental compliance activities, including stream gauging, monitoring, and other data collection activities, to assist water projects of the Bureau of Reclamation in—

(A)

achieving the purposes of the projects; and

(B)

fulfilling the duties of the Bureau under section 7 of the Endangered Species Act of 1973 (16 U.S.C. 1536); and

(3)

a forest, meadow, or watershed restoration activity on Federal land—

(A)

that has the potential—

(i)

to restore healthy forest or watershed conditions that improve the quality, timing, or other attributes of runoff to—

(I)

a Bureau of Reclamation facility or project; or

(II)

a surface or groundwater storage facility that is operated in conjunction with a Bureau of Reclamation facility or project;

(ii)

to reduce the rate of sedimentation of a Bureau of Reclamation facility; or

(iii)

to reduce the threat of wildfire that could affect runoff to, or sedimentation or structural integrity of, a Bureau of Reclamation facility; and

(B)

with respect to which—

(i)

the proportion that the amount of Federal funding under this section bears to the total cost of the project is approximately equal to, or less than, the proportion that water-related benefits bears to the total benefits of the project, as calculated by the Secretary using a methodology at the discretion of the Secretary; and

(ii)

Federal water contractors are likely to receive at least part of the water supply or water quality benefits of the project.

(b)

Priority

In carrying out this section, the Secretary shall give priority to restoration or environmental compliance activities that—

(1)

implement congressional direction, such as projects described in—

(A)

subsection (a)(3);

(B)

section 4001 or 4010 of the Water Infrastructure Improvements for the Nation Act (Public Law 114–322; 130 Stat. 1851); or

(C)

congressionally authorized species recovery programs on the Colorado River;

(2)

are recommended by collaborative processes or plans developed by Federal agencies in conjunction with States, water contractors, environmental or fishing interests, or other stakeholders; or

(3)

implement settlements with State agencies or requirements under State water laws to restore species listed as threatened or endangered under the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.) or other species adversely affected by the operation of water projects of the Bureau of Reclamation.

(c)

Cost-Share

(1)

In general

The Federal share of the cost of any individual program, activity, or project carried out using funds made available pursuant to this section—

(A)

shall be not more than 50 percent; and

(B)

shall be nonreimbursable.

(2)

Program-level calculation

The Federal cost-share described in paragraph (1) shall be calculated at the program level, at which a group of activities or projects are considered to be a part of a broader, cohesive program.

(d)

Authorization of appropriations

There are authorized to be appropriated to the Secretary—

(1)

$20,000,000 to carry out subsection (a)(3) for the period of fiscal years 2020 and 2021; and

(2)

$120,000,000 to carry out this section for the period of fiscal years 2022 through 2024.

(e)

Applicable law

Nothing in this section shall be interpreted or implemented in a manner that—

(1)

preempts or modifies any obligation of the United States under Federal law to act in accordance with applicable State law, including applicable State water law; or

(2)

affects or modifies any obligation under Federal environmental law.

8.

Deauthorization of certain water recycling projects

(a)

Purpose; definition

(1)

Purpose

The purpose of this section is to establish an efficient and transparent 1-time process for deauthorizing Bureau of Reclamation title XVI projects that have failed—

(A)

to receive a minimum level of Federal investment; or

(B)

to initiate construction.

(2)

Definition of title XVI project

In this section, the term title XVI project means a project authorized by title XVI of Public Law 102–575 (43 U.S.C. 390h et seq.).

(b)

Backlog list

Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, and make available on a publicly accessible internet website in a manner that is downloadable, searchable, and sortable, a list of—

(1)

title XVI projects—

(A)

that are authorized; and

(B)

for which, during the fiscal year in which this Act is enacted and each of the preceding 10 fiscal years—

(i)

no application for Federal funding has been received; and

(ii)

no construction has occurred; and

(2)

for each title XVI project listed under paragraph (1)—

(A)

the date of authorization of the title XVI project, including any subsequent modifications to the original authorization;

(B)

a brief description of the title XVI project; and

(C)

any amounts appropriated for the title XVI project that remain unobligated.

(c)

Interim deauthorization list

(1)

In general

The Secretary shall develop and make publicly available an interim deauthorization list that identifies each title XVI project described in subsection (b)(1).

(2)

Public comment and consultation

(A)

In general

The Secretary shall solicit and accept, for a period of not less than 90 days, comments relating to the interim deauthorization list under paragraph (1) from—

(i)

the public; and

(ii)

the Governor of each applicable State.

(B)

Project sponsors

As part of the public comment period under subparagraph (A), the Secretary shall provide to title XVI project sponsors the opportunity to provide to the Secretary a notice of the intent to initiate construction of the title XVI project by not later than the date that is 2 years after the date of publication of the preliminary final deauthorization list under subsection (d).

(3)

Submission to Congress; publication

Not later than 90 days after the date of submission of the backlog list under subsection (b), the Secretary shall—

(A)

submit the interim deauthorization list under paragraph (1) to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives; and

(B)

publish the interim deauthorization list in the Federal Register.

(d)

Preliminary final deauthorization list

(1)

In general

The Secretary shall develop a preliminary final deauthorization list that includes each title XVI project identified pursuant to paragraph (2).

(2)

Identification of projects

(A)

Exclusions

The Secretary may identify a title XVI project described in subsection (b)(1) for exclusion from the preliminary final deauthorization list if the Secretary determines, on a case-by-case basis following receipt of public comments, that the title XVI project is critical for interests of the United States, based on the practicable impact of the title XVI project on—

(i)

public health and safety;

(ii)

the national economy; or

(iii)

the environment.

(B)

Subject to deauthorization designation

Any title XVI project the sponsor of which has provided to the Secretary a notice of the intent to initiate construction by not later than 2 years after the date of publication of the preliminary final deauthorization list under this subsection shall be designated on that list as subject to deauthorization.

(C)

Appendix

The Secretary shall include as part of the preliminary final deauthorization list under this subsection an appendix that—

(i)

identifies each title XVI project included on the interim deauthorization list under subsection (c) that is not included on the preliminary final deauthorization list; and

(ii)

describes the reasons why each title XVI project identified under clause (i) is not included on the preliminary final deauthorization list.

(3)

Submission to Congress; publication

Not later than 120 days after the date of expiration of the public comment period under subsection (c)(2)(A), the Secretary shall—

(A)

submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives the preliminary final deauthorization list and the appendix required under this subsection; and

(B)

publish the preliminary final deauthorization list and appendix in the Federal Register.

(e)

Deauthorization; congressional review

Effective beginning on the date that is 180 days after the date of submission to Congress of the preliminary final deauthorization list under subsection (d)(3)(A), each title XVI project included on that list is deauthorized, unless—

(1)

the title XVI project is designated as subject to deauthorization pursuant to subsection (d)(2)(B); or

(2)

Congress has enacted a joint resolution disapproving the preliminary final deauthorization list.

(f)

Updated final deauthorization list

(1)

Publication

Not later than the date that is 2 years after the date of publication of the preliminary final deauthorization list under subsection (d)(3)(B), the Secretary shall publish an updated final deauthorization list.

(2)

Projects subject to deauthorization

On the updated final deauthorization list under this subsection, the Secretary shall describe any title XVI project designated as subject to deauthorization on the preliminary final deauthorization list pursuant to subsection (d)(2)(B) as—

(A)

authorized, if the Secretary has received evidence that the sponsor of the title XVI project has substantially initiated construction on the title XVI project; or

(B)

deauthorized, if the Secretary has not received the evidence described in subparagraph (A).

(3)

Deauthorization

Any project described as deauthorized pursuant to paragraph (2)(B) shall be deauthorized on the date that is 180 days after the date of submission of the updated final deauthorization list under paragraph (1), unless Congress has enacted a joint resolution disapproving that list.

(g)

Treatment of project modifications

For purposes of this section, if a title XVI project has been modified by an Act of Congress, the date of authorization of the title XVI project shall be considered to be the date of the most recent modification.

9.

Offsets

(a)

Definition of water users' association

In this section:

(1)

In general

The term water users' association means an entity that is—

(A)

organized and recognized under applicable State law; and

(B)

eligible to enter into contracts with the Bureau of Reclamation—

(i)

to receive contract water for delivery to end users of the water; and

(ii)

to pay applicable charges relating to that water.

(2)

Inclusions

The term water users' association includes—

(A)

an association;

(B)

a conservancy district;

(C)

an irrigation district;

(D)

a municipality;

(E)

a water project contract unit; and

(F)

any similar entity described in paragraph (1).

(b)

Prepayment of certain repayment contracts

(1)

Conversion and prepayment

On receipt of a request from a party to the contract, the Secretary shall convert any water service contract in effect on the date of enactment of this Act between the United States and a water users' association to allow for prepayment of the contract pursuant to paragraph (2) under mutually agreeable terms and conditions, subject to the conditions that—

(A)

a water service contract entered into under subsection (e) of section 9 of the Act of August 4, 1939 (53 Stat. 1193, chapter 418), proposed to be converted under this subsection shall be converted to a repayment contract under subsection (d) of that section; and

(B)

a water service contract entered into under subsection (c)(2) of section 9 of the Act of August 4, 1939 (53 Stat. 1193, chapter 418), proposed to be converted under this subsection shall be converted to a contract under subsection (c)(1) of that section.

(2)

Prepayment

Except for a repayment contract under which the contractor has previously negotiated for prepayment, on request of a party to the contract, a repayment contract under section 9(d) of the Act of August 4, 1939 (53 Stat. 1195, chapter 418), in effect on the date of enactment of this Act, and all contracts converted pursuant to paragraph (1)(A), shall—

(A)

provide for the repayment, in lump sum or by accelerated prepayment, of the remaining construction costs identified in water project-specific irrigation rate repayment schedules, as adjusted to reflect payments not reflected in those schedules, and properly assignable for ultimate return by the contractor, or if made in approximately equal installments, not later than 3 years after the effective date of the repayment contract, subject to the conditions that—

(i)

the amount shall be discounted by 1/2 the Treasury rate; and

(ii)

an estimate of the remaining construction costs, as adjusted, shall be provided by the Secretary to the contractor by not later than 90 days after the date of receipt of a request from the contractor;

(B)

require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referred to in subparagraph (A), and properly assignable to the contractor, shall be repaid—

(i)

by not later than 5 years after the date of notification of the allocation if the amount is a result of a collective annual allocation of capital costs to the contractors exercising contract conversion under this subsection of less than $5,000,000; or

(ii)

if the amount is equal to $5,000,000 or more, in accordance with applicable reclamation laws;

(C)

provide that power revenues will not be available to aid in repayment of construction costs allocated to irrigation under the contract; and

(D)

continue in effect for the period during which the contractor pays applicable charges, in accordance with section 9(d) of the Act of August 4, 1939 (53 Stat. 1195, chapter 418), and other applicable law.

(3)

Covered contract requirements

(A)

Definition of covered contract

In this paragraph:

(i)

In general

The term covered contract means—

(I)

on request of the contractor, a repayment contract under subsection (c)(1) of section 9 of the Act of August 4, 1939 (53 Stat. 1193, chapter 418), that is in effect on the date of enactment of this Act; and

(II)

a contract converted pursuant to paragraph (1)(B).

(ii)

Exclusion

The term covered contract does not include a repayment contract under which the contractor has previously negotiated for prepayment.

(B)

Requirements

Each covered contract shall—

(i)

provide for the repayment, in lump sum, of the remaining construction costs identified in water project-specific irrigation rate repayment schedules, as adjusted to reflect payments not reflected in those schedules, and properly assignable for ultimate return by the contractor, subject to the condition that the contractor shall submit to the Secretary an estimate of any remaining construction costs, as adjusted, by not later than 90 days after the date of submission of the initial request of the contractor;

(ii)

require that construction costs or other capitalized costs incurred after the effective date of the contract or not reflected in the rate schedule referred to in clause (i), and properly assignable to the contractor, shall be repaid—

(I)

by not later than 5 years after the date of notification of the allocation, if the amount is a result of a collective annual allocation of capital costs to the exercising contract conversion under this subsection of less than $5,000,000; or

(II)

in accordance with applicable reclamation laws, if the amount is $5,000,000 or more; and

(iii)

continue in effect for the period during which the contractor pays applicable charges, in accordance with section 9(c)(1) of the Act of August 4, 1939 (53 Stat. 1194, chapter 418), and other applicable law.

(4)

Conditions

A contract entered into pursuant to paragraph (1), (2), or (3)—

(A)

shall not be adjusted on the basis of the type of prepayment financing used by the applicable water users' association;

(B)

shall conform to any other agreements, such as applicable settlement agreements and newly constructed appurtenant facilities agreements; and

(C)

shall not modify any other water service, repayment, exchange, or transfer contractual right between the applicable water users' association and the Bureau of Reclamation, or any right, obligation, or relationship of the water users' association and any affected landowner in accordance with applicable State law.

(c)

Accounting

(1)

Final cost allocation

Any amount paid pursuant to subsection (b) shall be subject to adjustment after a final cost allocation by the Secretary.

(2)

Contractor responsibility

(A)

In general

If a final cost allocation under paragraph (1) indicates that a cost properly assignable to a contractor covered by this section is greater than the amount paid by the contractor, the contractor shall be obligated to pay the remaining allocated costs in accordance with an additional repayment contract under subparagraph (B).

(B)

Additional repayment contracts

Subject to any other provision mutually agreed to by all affected parties, the term of an additional repayment contract under subparagraph (A) shall be—

(i)

not less than 1 year; and

(ii)

not more than 10 years.

(3)

Credit

If a final cost allocation under paragraph (1) indicates that a cost properly assignable to a contractor are less than the amount paid by the contractor, the Secretary shall credit the amount of the overpayment as an offset against any outstanding or future obligation of the contractor, with the exception of any Central Valley Project Restoration Fund charge assessed pursuant to section 3407(d) of Public Law 102–575 (106 Stat. 4727).

(d)

Applicability of certain provisions

(1)

Effect of existing law

On compliance by a contract or with, and discharge of, an obligation of repayment of construction costs pursuant to a contract under subsection (b)(2)(A), subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (43 U.S.C. 390mm) shall apply to any affected land.

(2)

Effect of other obligations

On payment by a contractor of any amount required under a repayment contract under subsection (b)(2)(A), the obligation of a contractor to repay construction costs or other capitalized costs described in subsection (b)(2)(B), (b)(3)(B), or (c) shall not affect—

(A)

the status of the contractor as having repaid all construction costs assignable to the contractor; or

(B)

the applicability of subsections (a) and (b) of section 213 of the Reclamation Reform Act of 1982 (43 U.S.C. 390mm).

(e)

Effect on existing law

Nothing in this section alters—

(1)

any repayment obligation of a water service or repayment contractor receiving water from the same water project, or shifts any cost that would otherwise have been properly assignable to—

(A)

a water users' association identified in paragraph (1), (2), or (3) of subsection (b), including—

(i)

operation and maintenance costs;

(ii)

construction costs; or

(iii)

any other capitalized cost incurred after the date of enactment of this Act; or

(B)

another contractor;

(2)

any specific requirement for the disposition of amounts received as repayment by the Secretary under Federal reclamation law (the Act of June 17, 1902 (32 Stat. 388, chapter 1093), and Acts supplemental to and amendatory of that Act (43 U.S.C. 371 et seq.));

(3)

the priority of a water service or repayment contractor to receive water; or

(4)

except as expressly provided in this section, any obligation under the reclamation laws, including the continuation of any Central Valley Project Restoration Fund charge assessed pursuant to section 3407(d) of Public Law 102–575 (106 Stat. 4727), of a water service or repayment contractor making a prepayment pursuant to this section.

(f)

Conforming amendment

Section 4011 of the Water Infrastructure Improvements for the Nation Act (Public Law 114–322; 130 Stat. 1878) is repealed.

10.

Savings clause

Nothing in this Act or an amendment made by this Act shall be interpreted or implemented in a manner that—

(1)

preempts or modifies any obligation of the United States or an eligible entity under Federal law to act in accordance with applicable State law, including applicable State water law; or

(2)

affects or modifies any obligation under Federal environmental law.